1 – Roudeshour SCPP 2008 – 2015 : Technical
Assist And Service To Roudeshour 2000MW Power Plant
2 – Roudeshour SCPP ( Siemens O&M ) 2008-2015 :
Technical Service And Man-Power Supply To Roudeshour 2000MW Power
Plants For Siemens O & M
3 – Siemens Projects In Various Power Plant In
Iran 1998 Till Now : Assistance In Different Category Of Jobs Same
As :: Technical Service , Supervisory , Commissioning , Installation
, Erection And Welding Services , Punch Point Removal And
Maintenance
4 – Guilan CCPP 2008 – 2015 : Technical Service
And Assist To Guilan Combined Cycle Power Plant
5 – Roudeshour SCPP ( Aryan Mahtab Gostar Co. )
2013 – 2014 : Conversion Project Relocation Work ( Phase-1 )
6 – Loushan PP 2012 : Manufacturing Lowshan’s
Power Plant Cooling Tower ( Cell 3 Unit 2 ) And Supplying All Needed
Material
7 – Guilan CCPP 2011c : Install And
Commissioning Of Swirl Flash System In Guilan Combined Cycle Power
Plant ( For The First Time In IRAN ) And Provision of All Projects
Needed Material
8 – Damavand PP 2010 : Insulation of Steam
Turbine , Boiler , Piping And Equipments
9 – Lowshan PP 2009 : Technical Service
Provider to Lowshan Power Plant
10 – Lowshan PP 2009 : Manufacturing Lowshan’s
Power Plant Cooling Tower ( Cell 2 Unit 2 ) And Supplying All Needed
Material
11 – Neka PP 2008 : Insulation Of Steam Turbine
, Boiler , Piping And Equipments.
12 – Roudeshour SCPP ( Unit International Co .
) 2006 – 2007 : Equipments Erection , Pre Commissioning &
Commisiioning Assistance
13 – Roudeshour SCPP ( Unit International Co .
) 2006 – 2007 : Pipes & Tanks Insulation
14 – Roudeshour SCPP ( Unit International Co .
) 2007 : Assistance Of 3 Generator Modification
15 – Yazd ( Petro Tech Co. ) 2006 : Pipe Line ,
Tanks , Equipment Insulation & Turbines Spray Insulation
16 – Neka CCPP ( Niroo Va Tavan Co. ) 2006 :
Pipe Line , Tanks , Equipment
Insulation & Turbines Spray Insulation
17 – Guilan CCPP ( Guilan I.P.D.C ) 2005 – 2007
: Renewing of Administration Building ( 1000 m^2 )
18 – Lowshan PP ( Guilan I.P.D.C ) 2005 :
Renewing of Demin Water Lines Piping
19 – Lowshan PP ( Guilan I.P.D.C ) 2005 :
Supervision of Steam Units Data Acquisition System Erection And
Commissioning (WinCC Based)
20 – Guilan CCPP ( Guilan I.P.D.C ) 2005 :
Annual Preventive Maintenance And Operation Of HVAC System
21 – Guilan CCPP ( GEA Co.) 2004 – 2005 :
Erection Of 84 PCs Gearboxes Of Air Cooled Condenser System ( 200KW
)
22 – Kerman CCPP ( Siemens Co . ) 2004 – 2005 :
Provision And Erection of Siemens Turbines Embedded Parts
23 – Kazeroon CCPP ( Siemens Co. ) 2004 – 2005
: Provision And Erection Of Siemens Turbines Embedded Parts
24 – Guilan CCPP ( Siemens Co ) 2002 – 2004 : 3
Generators Oil Leakage Rectification
25 – Mahshahr Petrochemical ( Barzin Co. ) 2003
– 2004 : Piping , Tank & Propylene Unit Equipments Erection &
Insulation
26 – Mobarakeh Steel Complex ( Tavan Karan Co )
2003 : Installation & Commissioning Of Industrial Equipments
27 – Neyshabour CCPP ( Barzin Co ) 2003 :
Turbine Spray Insulation
28 – Bandar Abbas & Shiraz ( Zolal Co. ) 2001 –
2003 : Sewage Refineries
29 – Fars CCPP
( Sadid Co. ) 2001 – 2003 : Industrial Piping & Boilers
Insulation
30 – Rasht Industrial City ( Pars Zar Asa Co )
2002 – 2003 : Erection & Commissioning Of Electrical & Mechanical
Equiments of Pars Khazar New Factories
31 – Rasht Industrial City ( Khazar Plastic Co
) 2002 – 2003 : Erection & Commissioning Of Electrical & Mechanical
Equipments Of Pars Khazar New Factories
32 – Guilan CCPP ( Siemens Co ) 2003 :
Installation Of Isolated Flange Of Main Gas Pipe Line Rectification
Of Chatodic Protection System Current Leakage
33 – Guilan CCPP ( Siemens Co ) 1998 – 2003 :
Supervision Of Overhaul Of 6*V94.2 Gas Turbines Repair of Stacks And
Stack Dampers
34 – Kerman CCPP ( Kerman I.P.D.C ) 2003 :
Supervision Of Overhaul Of 6*V94.2 Gas Turbines
35 – Rasht Industrial City ( Khazar Plastic )
2002 : Installation Of Technical Facility In Rasht Brance Khazar
Plastic Factory And Supplier Of All Needed Material For The Project
36 – Guilan CCPP ( Wagner Biro Co. ) 2001 :
Changing Of The Tube Bandles Bend Of L.P Part Of 6*HRSGs
37 – Guilan CCPP ( GEA Co . ) 2000 – 2001 :
Changing Of Main Compensator Of ACC ( 4800 MM ) – 9PCs